.01 Board of Trustees Submission
The Professional shall be responsible for the preparation of graphic material to be presented to the University Board of Trustees when their approval is required for a project.Refer to the "Board of Trustees (BOT) Submission Requirements" below for specific instructions on the requirements for information and graphics, based on project cost and type.
These documents provide guidelines to Penn State consultants for projects that require Penn State Board of Trustee approval or submittal for information only. Graphic standards and project guidelines are included. The Board of Trustee standing order BOT Major Project Guidelines language related to construction projects can be viewed at the BOT website.
Document | Version Date | Description |
---|---|---|
BOT Major Project Guidelines | January 2008 | This document provides direction to Penn State consultants for requirements for major construction projects requiring Board of Trustee approval. |
Architect Selection Photo Requirements | March 2007 | This document provides technical standards for submission of photos of built projects for architects shortlisted for major construction projects at Penn State. |
.02 Design Review Submission
- The Professional shall prepare and submit to the Owner, for review and approval, Design Documents and any other documents required by the Owner. Refer to the Design Phase Deliverables document below for specific submission requirements for each design phase.
- The Design Professional shall provide a written response to each Design Review Comment received.