Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Include Page
Wiki-CSS
Wiki-CSS

02 00 01 General Owner Requirements and Intent

.01 Storm and Sanitary Sewer cross connections

  1. University has identified buildings having improper cross-connections between the sanitary and storm drainage systems.  Design Professionals are responsible for addressing these conditions and making legal connections to the drainage systems.
  2. Contact Engineering Services for further information.