23 08 00 Commissioning of HVAC
.01 General Owner Requirements and Design Intent
- Reserved for future.
.02 Guide Specifications:
- Design Professional shall carefully review and edit the guideline specifications below, adapting them as needed to achieve application-specific, fully developed specifications for each project.
- These shall be edited using the process described in the instructions contained at the beginning of the document. Proposed modifications shall be reviewed with OPP staff.
- Finalized version shall be included in the project contract documents. Use of other specifications is not acceptable.
Document | Version | Description |
---|---|---|
23-05-93 Testing, Adjusting, and Balancing for 08-00 Commissioning of HVAC Guide Specification | March 9January 19, 20182019 | OPP minimum specification requirements for Testing, Adjusting and Balancing for Commissioning of HVAC |