Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
These items were developed by OPP Construction Services to highlight specific issues critical to the successful completion of a Penn State project. Many of these items are overlooked by design professionals and contractors during the course of a project. The checklists are intended for use by OPP Construction Services personnel when reviewing construction documents or working with contractors in the field. The checklists are arranged to align with the Construction Specification Institute's 50 division format.
Document | Version Date | Description |
---|---|---|
01 14 01 General Requirements | Dec. 6, 2012 | Work Restrictions - Old Main |
01 29 00 General Requirements | June 21, 2010 | Payment Procedures |
01 33 23 General Requirements | May 18, 2015 | Special Submittal Procedures |
14 20 00 Conveying Equipment | May 21, 2010 | Elevators |
23 21 13 HVAC | Nov. 18, 2011 | Hydronic Piping Systems |
23 21 23 HVAC | Feb. 24, 2010 | Hydronic Pumps |
23 52 00 HVAC | Nov. 17, 2011 | Heating Boilers |
26 05 10 Electrical | Feb. 8, 2010 | Electrical Testing |
26 05 26 Electrical | Nov. 24, 2010 | Grounding and Bonding of Electrical Systems |
26 05 73 Electrical | Feb. 8, 2010 | Engineering Power Studies |
26 23 00 Electrical | Jan. 25, 2010 | Low Voltage Switchgear |
26 56 00 Electrical | Jan. 29, 2010 | Exterior Lighting |
31 23 16.26 Earthwork | May 1, 2017 | Blasting Procedures |
32 90 00 Exterior Improvements & Roadways | Jan. 16, 2013 | Planting - OPP Inspection |
33 62 00 Utilities | Feb. 4, 2010 | Chilled Water Service |
33 71 00 Utilities | Jan. 12, 2010 | Electrical Utility Transmission and Distribution |
33 73 00 Utilities | Feb. 10, 2011 | Electrical Utility Transformers |
Panel | |||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||
|
Include Page | ||||
---|---|---|---|---|
|