02 00 01 General Owner Requirements and Intent

.01 Storm and Sanitary Sewer cross connections

  1. University has identified buildings having improper cross-connections between the sanitary and storm drainage systems.  Design Professionals are responsible for addressing these conditions and making legal connections to the drainage systems.
  2. Contact Engineering Services for further information.

 

02 10 00 UNASSIGNED

02 20 00 ASSESSMENT

02 30 00 SUBSURFACE INVESTIGATION

02 40 00 DEMOLITION AND STRUCTURE MOVING

02 50 00 SITE REMEDIATION

02 60 00 CONTAMINATED SITE MATERIAL REMOVAL

02 70 00 WATER REMEDIATION

02 80 00 FACILITY REMEDIATION

 

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

Document   Version DateDescription
 Mercury Information This links to a site provided by Penn States Environmental Health and Safety department. It should be referenced by anyone working in Penn State buildings, especially present and past laboratory areas, mechanical rooms and other areas where mercury may have been used. It contains mercury identification information instructions on what to do if mercury is encountered during work.

02 82 00 ASBESTOS REMEDIATION

...

02 83 00 LEAD REMEDIATION

...

 

...

02 84 16 HANDLING OF LIGHTING BALLAST AND LAMPS CONTAINING PCBs AND MERCURY

...

 

...