• 33 10 00_Concrete Thrust Block Detail.dwg
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Concrete Encasement Detail.dwg
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Air Release Detail.dwg
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Extended Valve Operator Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Domestic Meter-Backflow Assembly Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Concrete Thrust Block Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Concrete Encasement Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Air Release Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Roadway Valve Box Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_PSU Water Service and Water Line Ext Plan Approval Req.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Multiple Pipe Trench Bench Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 10 00_Fire_Domestic Meter-Backflow Assembly Detail.pdf
    Sep 14, 2022 • attached by Former user (Deleted)
  • 33 20 00 WELLS
    Sep 14, 2022 • contributed by Former user (Deleted)
  • 23 83 00 RADIANT HEATING UNITS
    Sep 08, 2022 • contributed by Former user (Deleted)
  • 31 20 00 EARTH MOVING
    Aug 31, 2022 • contributed by Former user (Deleted)
  • 312000.02 Stockpiling, Furnishing, and Placing Topsoil.docx
    Aug 31, 2022 • attached by Former user (Deleted)
  • 14 20 00 ELEVATORS
    Aug 31, 2022 • contributed by Former user (Deleted)
  • 26 53 00 EXIT SIGNS
    Aug 30, 2022 • contributed by Former user (Deleted)
  • 13 20 00 SPECIAL PURPOSE ROOMS
    Aug 29, 2022 • contributed by Former user (Deleted)
  • 09 90 00 PAINTING AND COATING
    Aug 29, 2022 • contributed by Former user (Deleted)
  • 11 10 00 VEHICLE AND PEDESTRIAN EQUIPMENT
    Aug 29, 2022 • contributed by Former user (Deleted)
  • 12 50 00 FURNITURE
    Aug 24, 2022 • contributed by Former user (Deleted)
  • 08 10 00 DOORS AND FRAMES
    Aug 23, 2022 • contributed by Former user (Deleted)
  • 08 50 00 WINDOWS (EXTERIOR INSULATING GLAZING UNITS)
    Aug 22, 2022 • contributed by Former user (Deleted)
  • 03 33 00 CASE-IN-PLACE CONCRETE FOR EXTERIOR WALKWAYS & CURBING
    Aug 22, 2022 • contributed by Former user (Deleted)
  • 03 00 01 Owner General Requirements and Design Intent
    Aug 22, 2022 • contributed by Former user (Deleted)
  • 27 00 00 COMMUNICATIONS
    Aug 18, 2022 • contributed by Former user (Deleted)
  • Min Standards Telecom.docx
    Aug 18, 2022 • attached by Former user (Deleted)
  • 02 00 01 General Owner Requirements and Intent
    Aug 17, 2022 • contributed by Former user (Deleted)
  • HFS Access Control Performance Specification.pdf
    Aug 17, 2022 • attached by Former user (Deleted)
  • 12 20 00 WINDOW TREATMENTS
    Aug 16, 2022 • contributed by Former user (Deleted)
  • HFS Intrustion Alarm Specification.docx
    Aug 02, 2022 • attached by Former user (Deleted)
  • Emergency Phone Specifications.pdf
    Aug 02, 2022 • attached by Former user (Deleted)
  • Custodial Design Standards.docx
    Jun 02, 2022 • attached by Former user (Deleted)
  • PSU OPP Contractor_Safety_Requirements.pdf
    May 16, 2022 • attached by Former user (Deleted)
  • Form of Agreement 1-S (R) - WEB.pdf
    May 06, 2022 • attached by Former user (Deleted)
  • Form of Agreement 1-P (R) - WEB.pdf
    May 06, 2022 • attached by Former user (Deleted)
  • 260513 - Medium Voltage Cables and Terminations (002).doc
    Feb 18, 2022 • attached by Former user (Deleted)
  • 261316 - Medium Voltage Load Interrupter Switch.doc
    Feb 18, 2022 • attached by Former user (Deleted)
  • 261216 - Medium Voltage Dry Type Transformers.doc
    Feb 18, 2022 • attached by Former user (Deleted)
  • 33 63 00 STEAM ENERGY DISTRIBUTION
    Jan 10, 2022 • contributed by Former user (Deleted)
  • PSU Steam Standards 20210811.docx
    Jan 10, 2022 • attached by Former user (Deleted)
  • 00 20 00 INSTRUCTIONS FOR PROCUREMENT
    Jan 07, 2022 • contributed by Former user (Deleted)
  • sectionG.doc
    Jan 07, 2022 • attached by Former user (Deleted)
  • SECTION A.doc
    Jan 07, 2022 • attached by Former user (Deleted)
  • PSU_Project_Delivery_Guidebook.pdf
    Nov 30, 2021 • attached by Former user (Deleted)
  • PSU_Process_and_Deliverables_Chart.pdf
    Nov 30, 2021 • attached by Former user (Deleted)
  • Section I PSU Construction COVID19.docx
    Sep 23, 2021 • attached by Former user (Deleted)
  • Construction Services QA/QC Checklists
    Aug 27, 2021 • contributed by Former user (Deleted)
  • 01 33 23 Special Submittal Procedures QA QC 2015(1).pdf
    Aug 27, 2021 • attached by Former user (Deleted)
Show More Please wait