02 00 01 General Owner Requirements and Intent

01 Storm and Sanitary Sewer cross connections
  1. The University has identified buildings having improper cross-connections between the sanitary and storm drainage systems.  Design Professionals shall address these conditions and make legal connections to the appropriate drainage systems.
  2. Designers shall inquire through the appropriate Penn State Project Manager and Penn State Engineering Services for the identification of such cross connections within their project area and coordinate on the approach taken towards their resolution.


 