These items were developed by OPP Construction Services to highlight specific issues critical to the successful completion of a Penn State project. Many of these items are overlooked by design professionals and contractors during the course of a project. The checklists are intended for use by OPP Construction Services personnel when reviewing construction documents or working with contractors in the field. The checklists are arranged to align with the Construction Specification Institute's 50 division format.

 

33 62 00 Utilities33 73 00 Utilities
DocumentVersion DateDescription
01 14 01 General RequirementsDec. 6, 2012Work Restrictions - Old Main
01 29 00 General RequirementsJune 21, 2010Payment Procedures
01 33 23 General RequirementsMay 18, 2015Special Submittal Procedures
14 20 00 Conveying EquipmentMay 21, 2010Elevators
23 21 13 HVACNov. 18, 2011Hydronic Piping Systems
23 21 23 HVACFeb. 24, 2010Hydronic Pumps
23 52 00 HVACNov. 17, 2011Heating Boilers
26 05 10 ElectricalFeb. 8, 2010Electrical Testing
26 05 26 ElectricalNov. 24, 2010Grounding and Bonding of Electrical Systems
26 05 73 ElectricalFeb. 8, 2010Engineering Power Studies
26 23 00 ElectricalJan. 25, 2010Low Voltage Switchgear
26 56 00 ElectricalJan. 29, 2010Exterior Lighting
31 23 16.26 EarthworkMay 1, 2017Blasting Procedures
32 90 00 Exterior Improvements & RoadwaysJan. 16, 2013Planting - OPP Inspection
Feb. 4, 2010Chilled Water Service
33 71 00 UtilitiesJan. 12, 2010Electrical Utility Transmission and Distribution
Feb. 10, 2011Electrical Utility Transformers