Provide at least one (1) spare breaker in each frame size and at least 10% fully provisioned space capacity.
.02 Guide Specifications
Design Professional shall carefully review and edit the guideline specifications below, adapting them as needed to achieve application-specific, fully developed specifications for each project.
These shall be edited using the process described in the instructions contained at the beginning of the document. Proposed modifications shall be reviewed with OPP Engineering Services.
Finalized version shall be included in the project contract documents. Use of other specifications is not acceptable.
Typical University Switchboard Datasheet for the Professionals use. The datasheet instructions are found in the guide specification and a sample is found in Division 26 00 00.