Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
.01 General
  1. For new buildings, major renovations, and additions, perform a lighting risk assessment per NFPA 780.  Consult with Engineering Services to determine if a lightning protection system is required. 
  2. System components shall be copper.
  3. System installation shall be concealed within the building structure.
  4. Design per NFPA 780 and require a U.L. Master Labelshall be included in Schematic Phase and included in all roof plans and elevations; on major projects discuss and incorporate in design prior to BOT Presentations.

Panel
borderColorlightgrey
bgColorwhite
borderWidth1
borderStylesolid


Div
idnoprint
classnoprint

Page Navigation

Table of Contents
printable
minLevel2
indent3px
stylenone
falseclassdivision-toc
printablefalse


Related Files

Attachments
uploadfalse
oldfalse
patterns.*pdf,.*doc,.*docx,.*xls,.*xlsx,txt,.*dwg,.*rtf
sortByname


Include Page
Wiki-CSS
Wiki-CSS