Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

00 21 00 FRONT ENDS NON-DGS PROJECTS

These specifications are provided for insertion into the Project Manual of all bid projects. The design Professional must include the entire document (sections A-H). In some of the sections you will be required to make some project specific selections, instructions are contained within the document. These selections should be discussed with the Project Manager. Sections C and D (also the CM General Conditions) are samples provided for your information and should not be edited. Your Project Manager will provide a clean copy of section D (General Conditions) to you for incorporation into the specifications. You should include the "sample" contract in the specifications. The Professional is also responsible for coordinating the information in these documents with their own specifications.

Document

Version 
Date

Description
Section A January 2017Notice to Bidders                                                                 
Section B January 2017Form of Proposal
Section C January 2017Form of Agreement 1-C (sample)
Section D July 2017General Conditions of the Contract (sample)
Section D1October 2001Notification of Contract Requirements Pertaining to the Prevailing Wage Act
Section E
October 2001List of Drawings
Section F (UP) July 2017General Conduct of the Work and Special Requirements for University Park
Section F (non-UP)
January 2009General Conduct of the Work and Special Requirements the Commonwealth Campuses
Section F - (HMC)June 2016General Conduct of the Work and Special Requirements for the Hershey Medical Center
Section GOctober 2001Basis of Bids
Section HOctober 2001Scope of Work
MBE-WBE Exhibit AJuly 2017DBE Contractor / Supplier Utilization Form

Page Navigation


Related Files

  File Modified

  • No labels