Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

.01 General
  1. For new buildings, major renovations, and additions, perform a lighting risk assessment per NFPA 780.  Consult with Engineering Services to determine if a lightning protection system is required. 
  2. System components shall be copper.
  3. System installation shall be concealed within the building structure.
  4. Design per NFPA 780 and require a U.L. Master Label.

Page Navigation


Related Files

  File Modified

  • No labels