Title | Effective Date | Description |
---|---|---|
Section 26 00 00 Electrical | Jun 06, 2017 10:55 AM | An update to the University’s lighting standards throughout division 26; to accomplish needed change and revision. Section 26 09 23 Lighting Control Devices... |
Section 01 35 20 Safety Requirements | May 22, 2017 11:45 AM | To add sub section .03 Prevention through Design Standards |
Section 23 21 13 Hydronic Piping Guidespec | Mar 22, 2017 07:05 AM | Complete replacement of existing word document specification in table |
Section 33 40 00 Stormwater Drainage | Mar 16, 2017 02:10 PM | Stormwater section major delete and replace |
Section 23 25 00 HVAC Water Treatment-commonwealth -PDF | Mar 13, 2017 02:40 PM | Water treatment Commonwealth |
Section 23 21 13 D02 pdf | Mar 13, 2017 02:35 PM | Hydronic Plant Piping Schematic D2 |
Section 23 21 13D01pdf | Mar 13, 2017 02:30 PM | Hydronic Plant Piping Schematic |
Section 23 25 00 HVAC Water Treatment-commonwealth -word doc | Mar 13, 2017 08:55 AM | HVAC Water Treatment for Commonwealth |
Section 23 25 00 HVAC Water Treatment | Mar 09, 2017 08:20 AM | Section was updated to meet Project-specific requirements. |
Section 26 00 00 Lighting | Nov 03, 2016 11:03 AM | Update lighting standards throughout division 26 |
Section 25 55 00 | Oct 26, 2016 03:03 PM | Replaced section 25 55 00 dated Sept. 2016 with revised section 25 55 00 dated Oct. 2016 |
Section 23 82 00 Convection Heating and Cooling Units | Oct 05, 2016 11:10 AM | Modified subsections .01 and .02 regarding coil selection criteria, including the intent to support the future use of 140 degree water. |
Section 25 55 00 | Sep 22, 2016 02:00 PM | Replaced section 25 55 00 dated NOV2015 in its entirety with new section 25 55 00 dated SEPT2016 |
Section 01 35 20 Safety Requirements | Sep 09, 2016 11:50 AM | To revise safety requirements |
Section 26 50 00 Lighting | Jul 19, 2016 09:22 AM | A University lighting matrix was added to the standard for clarity. |
Section 26 36 00 Transfer Switches | Jun 17, 2016 08:40 AM | Deleted old section and replaced with new section, which includes a new guide specification section and new additional data sheet. |
Section 26 22 00 Low-voltage Transformers | Jun 16, 2016 11:10 AM | Deleted old section and replaced with new section, which includes a new guide specification section and new additional datasheet. |
Section 26 24 16 Panelboards | Jun 16, 2016 11:10 AM | Deleted old section and replaced with new section, which includes a new guide specification section and new additional datasheet. |
Section 26 32 13 Engine Generators | Jun 16, 2016 11:05 AM | Deleted old section and replaced with new section, which includes a new guide specification section and new additional datasheet. |
Section 26 24 13 Switchboards | Jun 14, 2016 02:30 PM | Delete old section and replace with new section |
Title | Effective Date | Description |
Section 26 05 53 Identificaiton for Electrical Systems | Jun 08, 2016 10:35 AM | Delete and replace section |
Section 26 05 73 Power Systems Studies | Jun 08, 2016 09:15 AM | Deleted old section and replaced with new section, which includes a new guide specification section and sample standard arc flash labels. |
Section 26 05 26 Grounding | Jun 02, 2016 02:00 PM | Section deletion and replacement |
Section 26 00 01 Owner General Requirements | Jun 02, 2016 09:30 AM | rev to part E |
28 00 00 Electronic Safety and Security | May 19, 2016 01:55 PM | Update Fire Alarm Standards |
22 31 00 Domestic Water Softeners | May 19, 2016 11:05 AM | Revisions to the domestic water softener section to remove ion exchange softeners. |
01 05 05 Space Planning | May 17, 2016 02:10 PM | .07 Addition of Lactating Rooms to PSU Design & Construction Standards |
01 05 05 Space Planning | May 17, 2016 01:55 PM | To revise Section .05 Unisex Toilet Rooms |
01 40 00 Quality Requirements | Apr 25, 2016 10:46 AM | Revised Environmental Compliance Checklist 4-4-16 |
09 68 10 Carpet Tile | Apr 25, 2016 10:15 AM | Revisions to 096810 Carpet Tile as a result of the most recent University Sustainable Carpet Committee assessment process. |
32 00 00 Exterior Improvements | Apr 13, 2016 02:55 PM | 32 90 00.02 Planting Revisions |
01 40 00 Quality Requirements | Jan 12, 2016 09:25 AM | Revised Environmental Compliance Checklist |
23 00 10 Subsection 12 | Dec 16, 2015 09:34 AM | Laboratory Ventilation Systems - Replace entire subsection |
25 00 00 | Dec 02, 2015 10:15 AM | 25 55 00 BAS Guide Spec Update -November 2015 version |
23 00 10 Subsection 12 | Nov 16, 2015 11:25 AM | Lab Vent Systems - EHS Interim Guidance |
25 00 00 | Nov 02, 2015 02:10 PM | 25 55 00 BAS Guide Spec Update - October 2015 version |
08 70 00 | Oct 27, 2015 01:45 PM | Updated door hardware |
Section 07 00 00 | Oct 07, 2015 04:10 PM | Section was updated to reflect changes in roof construction. |
Section 23 21 13 | Oct 07, 2015 10:10 AM | Section was updated to reflect prohibition on air pressure testing in hydronic piping systems. |
Section 08 00 00 | Jul 14, 2015 10:00 AM | Section was updated primarily for the following reasons: 1) To rename main heading of Division to match current industry practice 2) To consolidate requirem... |
Effective Date | Description | |
Section 01 81 13 | Jul 13, 2015 09:35 AM | Added alternate bid requirements for Energy Conservation options. |
Section 32 90 00 | Jul 10, 2015 10:20 AM | Modified subsections .02 and .03 |
Section 14 20 00 | Jul 01, 2015 02:50 PM | Updated entire section on Elevators |
Section 25 00 00 | Apr 30, 2015 03:09 PM | Updated document table in section 25 00 00. Remainder of section is unchanged. |
Section 01 81 13 | Apr 03, 2015 12:10 PM | Deleted .01 Owner General Requirements and Design Intent and .02 LEED Certification Requirements and replaced with new text. |
Section 23 00 01 | Mar 20, 2015 01:45 PM | Added link to 01 00 00 General Requirements |
Section 01 50 00 | Mar 17, 2015 02:22 PM | Added new subsection 01 56 16 to section 01 50 00 |
Section 26 36 00 | Mar 16, 2015 09:10 AM | Modified section 26 36 00 |
Division 26 00 00 | Feb 20, 2015 03:07 PM | Revised various sections in Division 26 |
Section 26 36 00 | Feb 06, 2015 10:55 AM | Modified Section 26 36 00 Transfer Switches |
Section 23 21 23 | Jan 16, 2015 10:58 AM | Modified subsection .03 in Section 23 21 23 |
Section 23 25 00 | Oct 24, 2014 02:36 PM | Modified Section 23 25 00 HVAC Water Treatment to include a new guide specification. |
Section 33 10 00 | Sep 19, 2014 02:17 PM | Replaced Section 33 10 00 in its entirety |
Section 26 29 23 | Aug 27, 2014 01:00 PM | Replaced OPP VFD GuideSpec document |
Section 25 90 00 | Jul 29, 2014 12:42 PM | Removed guide sequences of operation and replaced with guide sequences of operation |
Section 25 90 00 | Jul 29, 2014 12:25 PM | Removed guide sequences table and replaced it with guide sequences of operation |
Section 25 00 00 | Jul 15, 2014 09:48 AM | Replaced updated Building Automation Systems (BAS) document |
Section 25 90 00 | Mar 18, 2014 03:53 PM | Replaced the document for "Air terminal Units - Single Duct Variable Air Volume with Hot Water Reheat & Permiter Heating" |
Section 01 41 00 | Mar 06, 2014 11:36 AM | Updated Environmental regulatory Compliance Checklist and Addendum documents |
Section 23 21 16 | Mar 03, 2014 01:53 PM | Deleted subsection .05 Hydronic Specialties. Added section 23 21 16 in its entirety. |
Effective Date | Description | |
Section 26 50 00 | Feb 20, 2014 11:56 AM | Modified subsection .01 - Lighting Design |
Section 25 90 00 | Feb 12, 2014 02:04 PM | Updated the EUMS document |
Section 22 11 00 | Dec 06, 2013 03:31 PM | Deleted some text in subsection .01 of Section 22 11 00 |
Section 01 41 00 | Nov 14, 2013 10:03 AM | Modified section 01 41 00 to include Environmental Compliance Checklist |
Section 09 68 10 | Sep 18, 2013 11:26 AM | Modified section 09 68 10 |
Section 26 05 26 | Sep 16, 2013 02:24 PM | Reworded subsection .01 General in Section 26 05 26 to include 2-hold lug requirement. |
Section 23 05 01 | Jul 03, 2013 09:16 AM | Modify subsection .02.A.4 in Section 23 05 01. Remainder of section is unchanged. |
Section 23 31 00 | Jun 25, 2013 02:49 PM | Modified subsection .01 in Section 23 31 00. Remainder of section is unchanged. |
Section 23 00 01 | Jun 20, 2013 11:50 AM | Modified subsection .01, paragraph 5 in section 23 00 01. Remainder of section is unchanged. |
Section 23 00 10 | Jun 19, 2013 02:19 PM | Added new subsection .12 in its entirety in Section 23 00 10 |
Section 23 07 00 | Jun 19, 2013 01:50 PM | Deleted the current section and replaced it in its entirety |
Section 08 00 00 | May 17, 2013 08:49 AM | added specific requirements for thermally broken frames and edge spacers |
Section 23 41 00 | May 16, 2013 05:58 PM | Added new text to 23 41 00 |
Section 25 90 00 | May 16, 2013 04:51 PM | Updated the table with a new document |
Section 01 78 46 | Mar 08, 2013 09:48 AM | Added new subsection "01 78 46 Attic Stock" under section 01 70 00 |
Section 23 34 00 | Feb 27, 2013 12:14 PM | Replaced Section 23 34 00 in it's entirety. |
Section 26 22 00 | Dec 10, 2012 11:15 AM | Updated Section 26 22 00 |
Section 26 56 00 | Nov 28, 2012 08:29 AM | Added new test related to pole manufacturers and sensor control of luminaires |
Section 26 09 00 | Nov 27, 2012 02:19 PM | Updated requirements for occupancy sensor controls. |
Section 26 53 00 | Nov 26, 2012 12:14 PM | Added clarification regarding acceptance of red LED exit signs. | Title | Effective Date | Description
Section 26 00 01 | Oct 29, 2012 10:01 AM | Modified .10 Scope to add new paragraph "h" under Support Circuitry. |
Section 26 05 43 | Oct 29, 2012 08:50 AM | Added paragraph to .01 Underground Ducts and Raceways for Electrical Systems |
Section 26 52 00 | Oct 29, 2012 08:35 AM | Added additional paragraph in .01 General (26 52 00 Emergency Lighting) |
Section 26 50 00 | Oct 26, 2012 12:37 PM | Added subheading .01 in 26 50 00. Reworded .01 and .02, and added subheading .08 in 26 51 11. Remainder of section is unchanged. |
Section 33 62 00 | Oct 11, 2012 09:48 AM | Replaced documents with updated details and sequences |
Section 23 21 13 | Sep 20, 2012 03:30 PM | Deleted subsection .01 and .02 and replaced with new .01 to .04 in their entirety. Relocate text from existing subsection .03 to new .05 and delete remaining e... |
Section 23 05 01 | Aug 31, 2012 03:38 PM | Added a link to 23 21 00 Hydronic Piping and Pumps in subsection .02 B |
Section 23 22 00 | Aug 17, 2012 12:57 PM | Added Subsection .04 to Section 23 22 00 |
Section 23 21 00 | Aug 16, 2012 04:10 PM | Removed existing subsection .01 and replaced with new text. Added new text in subsections .03, .04, .05, and .06. Subsection .02 unchanged. |
Section 09 60 00 | Aug 02, 2012 04:06 PM | Added Section 09 60 00 to Division 09. |
Section 25 00 00 | Jul 24, 2012 03:48 PM | Replaced link to revised document "Building Automation Systems (BAS)" |
Section 23 00 10 | Jul 19, 2012 02:31 PM | Replaced subsection .03 with new text, taking out the old table. |
Section 23 31 00 | Jul 10, 2012 03:22 PM | Modified heading of Part .01 and replaced text under subpart A |
Section 26 29 23 | Jul 09, 2012 04:30 PM | Insert Document Table with new text and update the associated word document "OPP VFD Guidespec" |
Division 26 | Jun 22, 2012 05:23 PM | Modified various sections in Division 26 |
Section 23 21 00 | May 17, 2012 08:54 AM | Subsection .02 B - revised requirements on combination shut-off balance valves. |
Section 31 30 00 | May 16, 2012 03:34 PM | Added specification to address expansive aggregate |
Section 03 00 01 | May 16, 2012 10:24 AM | Section was added to reference new "Sructural Backfill and Compaction" Specification. |
Section 32 01 00 | May 15, 2012 02:08 PM | Section was revised to reflect changes to hiring of testing agencies |
Section 23 72 00 | Apr 18, 2012 09:51 AM | Section 23 73 00, part .02, items B and F were modified. Remainder of section is unchanged. | Title | Effective Date
Description | ||
Section 23 21 23 | Apr 09, 2012 01:51 PM | Modify subsection .03.A.6 of Section 23 21 23. Remainder of section is unchanged. |
Section 25 00 00 | Apr 06, 2012 08:17 AM | Replaced Building Automation Systems document. |
Section 25 90 00 | Feb 28, 2012 03:31 PM | Modify current section to replace linked document with updated document. |
Section 01 05 05.01 | Feb 28, 2012 02:27 PM | Modify current section to include requirements for card readers. |
Section 23 21 13 | Jan 30, 2012 11:05 AM | Additions to section 23 21 13 |
Section 12 40 00 | Jan 26, 2012 12:37 PM | Addition of section 12 40 00 |
Section 28 00 00 | Jan 16, 2012 11:32 AM | Post Revised specifications from ACES |
Section 33 50 00 | Jan 12, 2012 10:02 AM | Update 335000.01 to include 49 CFR Part 192 regulatory requirements for all PSU properties |
Section 23 57 00 | Jan 09, 2012 10:45 AM | Replace current section in its entirety to follow common industry practice and to expand section into three parts. |
Section 23 05 01.02 | Jan 06, 2012 08:40 AM | |
Section 23 05 01_02 and 23 21 13 | Nov 03, 2011 09:15 AM | Modify Secion 23 05 01_02 and Section 23 21 13_03 to delete conflicts and add cross references to other updated sections related to balancing valves in general ... |
Section 28 00 00 | Nov 02, 2011 11:32 AM | Remove old uploaded document and replace with new version. Add 3 additional uploaded document. |
Section 23 05 01 | Nov 01, 2011 02:44 PM | Replace obsolete Mechanical Color Code painting 1. Follow current industry ANSI/ASME A13.1 Standard for color coding scheme and piping system i... |
Section 23 70 00 | Nov 01, 2011 01:05 PM | Energy Recovery and Air Handling Units. |
Section 23 21 00.02 | Sep 26, 2011 09:04 AM | Addition of section 23 21 00.02, Flow Balance and Differential Pressure Control |
Section 23 21 23 | Sep 21, 2011 11:05 AM | Modify subsection .03, a.5 in Section 23 21 23. Remainder of section is unchanged. |
Revision 01 01 02 | Sep 21, 2011 10:27 AM | Update requirements document to match current University expectations for Design Review Deliverables. |
Section 09 90 00 | Sep 16, 2011 07:52 AM | Update paint manufacturers. |
Section 25 90 00 | Aug 15, 2011 01:40 PM | Update to 25 90 00 EUMS Document rev3 |
Section 23 21 13 | Aug 15, 2011 11:32 AM | Revision to 23 21 13.03 A, Hydronic Specialties | Title | Effective Date | Description
Section 23 22 00 | Jul 22, 2011 08:10 AM | Revisions to Section 23 22 00 completed 7/22/2011 |
Section 01 01 00 and 23 05 01 | Jul 22, 2011 08:09 AM | Modify Sections 01 01 00 subsection .01 and 23 05 01 subsection .05 per the following (deletions are shown struck through and additions are double underlined). ... |
Section 25 00 00 | Apr 26, 2011 09:42 AM | Criteria for Belimo PICCV valve selection developed by Steve Oskin |
Section 33 62 00 | Apr 25, 2011 11:20 AM | Uploading new documents to the section, and fixing one misspelling. |
Section 07 00 00 | Apr 25, 2011 09:20 AM | Additions to current section to include cross references. |
Section 22 11 00 | Apr 22, 2011 01:45 PM | Add more detailed general, materials, and installations requirements for pressed joint system. |
Section 23 82 00 / 23 82 19 | Mar 08, 2011 01:38 PM | Add new section to replace outdated references in 23 82 00 .04 |
Section 25 00 00 | Mar 07, 2011 12:59 PM | Update Building Audtomation Systems (BAS) Guide Spec |
Section 23 64 00 | Dec 20, 2010 11:29 AM | |
Section 33 60 00, 33 61 00 and 33 62 00 | Dec 20, 2010 10:38 AM | Update sections with added content and document clarification. |
Section 25 90 00 | Dec 03, 2010 12:00 AM | Revise AHU Sequence of Operation and add supporting diagrams. |
Section 26 29 23 | Dec 01, 2010 02:10 PM | Revise guidance and description of VFD specification, update guide specification with new document. |
Section 23 00 01 | Nov 09, 2010 11:49 AM | Coordinate with section 01 81 13, expand general HVAC design and coordination requirements, and general reorganization. |
Section 01 81 13 | Oct 28, 2010 02:55 PM | Update to further describe sustainable design objectives, and to adopt ASHRAE Standard 189.1 as high performance "Green" Standard for the University. |
Section 25 90 00 | Oct 11, 2010 10:42 AM | Upload new guide Sequence of Operations for Enterprise Utility Management System (EUMS) Equipment Control Strategies |
Section 22 40 00 | Oct 11, 2010 10:30 AM | update requirements for water closets, urinals, and floor drains. |
Section 01 56 10 | Aug 16, 2010 11:00 AM | Add outdoor air intake protection requirements |
Section 25 90 00 | Jun 22, 2010 02:54 PM | Replace June 2009 version of the following embedded document: Remainder of section is unchanged. |
Section 01 25 30 | Apr 19, 2010 11:12 AM | Revise Division 01 to provide a dedicated section (01 25 30) for safety requirements; add new fall protection requirements. |
Section 25 90 00 | Apr 19, 2010 10:55 AM | Upload new guide Sequence of Operation for Air Terminal Units - Single Duct Variable Air Volume with Hot Water Reheat & Perimeter Heating | Title | Effective Date | Description
Sections 26 05 53 through 26 56 00 | Mar 18, 2010 10:00 AM | Update of several sections within Division 26, including labeling, lift equipment requirements, lighting controls, generators, transfer switches, surge suppress... |
Sections 23 05 01 and 23 05 19 | Dec 04, 2009 08:57 AM | Revise thermometer and gauge requirements in HVAC systems. |
Revision 01 35 13 | Nov 10, 2009 11:11 AM | Upload HMC Infection Control Policy at .02C |
Section 23 21 23 | Nov 02, 2009 11:21 AM | Update requirements of flexible pump couplings for Base Mounted End Suction Pumps and Base Mounted Double Suction Pumps. |
Section 01 05 05 | Oct 30, 2009 03:31 PM | Update dumpster location requirements and compactor requirements. |
Sections 08 00 01, 08 10 00, 08 50 00, 08 80 00 | Sep 21, 2009 02:38 PM | Update to window and glazing standards. |
Section 01 35 13 | Aug 28, 2009 10:49 AM | Upload new HMC Design Standards documents |
Section 01 35 13 | Aug 28, 2009 10:47 AM | Add new section 01 35 13 |
Section 28 00 00 | Aug 28, 2009 09:46 AM | Upload new specifications document to standards. |
Section 13 21 00 | Aug 18, 2009 10:15 AM | Modify minimum face velocity and component requirements of hoods in radioisotope laboratories. |
Section 23 70 00 | Aug 13, 2009 01:14 PM | Update air handler requirements regarding efficiency, system reliability, redundancy, identification, fan arrangement considerations, proper mixing, bearings, d... |
Section 25 90 00 | Jul 07, 2009 12:27 PM | Updated temperature control sequence description and explanatory text |
Section 25 90 00 | Jul 07, 2009 12:24 PM | Add a new document describing the sequences of operation necessary to accomplish the HVAC functions of the Enterprise Utility Management System (EUMS). |
Section 23 21 23 | Jun 29, 2009 12:00 AM | Replace current section in its entirety to include new requirements of general design and installation. |
Section 01 81 13 | None | Added new subsection .04 in its entirety. Remainder of section unchanged. |