Revision Log and Archive
The Office of Physical Plant updates the Design and Construction Standards as needed to keep pace with changing technology and changes in University requirements.
Comments and proposed corrections or revisions are welcome from all users of the Standards and should be directed in writing via email to opp_es@ums.psu.edu.
All proposed changes to the Standards are reviewed by the Standards Coordinator and a Standards Team composed of technical experts representing a cross section of OPP.
Upon review and approval by the Standards Coordinator and Standards Team, a proposed revision will be implemented.
Significant changes to the Standards that have been implemented are recorded in the Revision Log. Note that the University does not record corrections of typographical errors, non-technical grammatical corrections, changes to Division 00, or changes to the Introduction to the Design Standards in the Revision Log.
The most recent revisions are highlighted on the right side of this page. To see a complete list of all revisions since the last archive, follow the link below to the Revision Log. At the Revision Log page, users can view the full text of each revision and can subscribe to an RSS feed to be notified of new changes in their news feed viewer.
Click Here to subscribe to Revision Log updates via RSS
PSU Design Standards Revisions Log
Older versions of the Design and Construction Standards are stored in the Archives folder. To view these archived versions, follow the link below.
Recent updates
-
Division 00 - Procurement and Contracting RequirementsApr 19, 2024 • contributed by Jesse Wells
-
JOC Proposal Review Instructions.pdfApr 19, 2024 • attached by Jesse Wells
-
09 60 00 FLOORINGMar 28, 2024 • contributed by Vanessa Bierly
-
26 05 00 COMMON WORK RESULTS FOR ELECTRICALMar 04, 2024 • contributed by Vanessa Bierly
-
Minimum Clearances for Pad-Mounted Equipment.pdfMar 04, 2024 • attached by Vanessa Bierly
-
25 00 00 INTEGRATED AUTOMATIONFeb 15, 2024 • contributed by Vanessa Bierly
-
25000-BAS Guide Spec.docxFeb 15, 2024 • attached by Vanessa Bierly
-
26 51 00 INTERIOR LIGHTINGFeb 01, 2024 • contributed by Vanessa Bierly
-
26 50 00 LIGHTINGFeb 01, 2024 • contributed by Vanessa Bierly
-
32 90 00 PLANTINGJan 31, 2024 • contributed by Vanessa Bierly
-
Site Lighting Naming Convention.pdfJan 29, 2024 • attached by Vanessa Bierly
-
26 56 00 EXTERIOR LIGHTINGJan 29, 2024 • contributed by Vanessa Bierly
-
26 52 00 EMERGENCY LIGHTINGJan 29, 2024 • contributed by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
26 09 23 Lighting Control Devices and SystemsJan 29, 2024 • contributed by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
01 30 00 ADMINISTRATIVE REQUIREMENTSDec 20, 2023 • contributed by Vanessa Bierly
-
Change Order Summary and Cost Breakdown Form.xlsmDec 01, 2023 • attached by Jesse Wells
-
01 05 00 GENERAL PROJECT REQUIREMENTSNov 29, 2023 • contributed by Vanessa Bierly
-
JOC Joint Meeting Topics New.docxOct 25, 2023 • attached by Jesse Wells
-
Design and Construction StandardsOct 23, 2023 • contributed by Vanessa Bierly
-
1-CM-A Agreement MASTER.pdfOct 12, 2023 • attached by Jesse Wells
-
1-CM-GMP.pdfOct 12, 2023 • attached by Jesse Wells
-
1-C.pdfOct 12, 2023 • attached by Jesse Wells
-
DGS 1-C.pdfOct 12, 2023 • attached by Jesse Wells
-
2C FOA EB.pdfOct 12, 2023 • attached by Jesse Wells
-
CM GMP General Conditions.pdfOct 12, 2023 • attached by Jesse Wells
-
SECTION D General Conditions.pdfOct 12, 2023 • attached by Jesse Wells
-
Section D (DGS) General Conditions.pdfOct 12, 2023 • attached by Jesse Wells
-
SECTION F (UP).docxOct 12, 2023 • attached by Jesse Wells
-
eB Section A.docOct 12, 2023 • attached by Jesse Wells
-
22 40 00 PLUMBING FIXTURESAug 29, 2023 • contributed by Vanessa Bierly
-
OPP Design Standard_Safety_Emergency Flushing Equipment_final_8.25.23.docxAug 29, 2023 • attached by Vanessa Bierly
-
10 10 00 INFORMATION SPECIALTIESAug 28, 2023 • contributed by Vanessa Bierly
-
2023_PSU Interior Standards Manual.pdfAug 28, 2023 • attached by Vanessa Bierly
-
Worker Protection and Investment Cert. Form - 2 pages.pdfAug 24, 2023 • attached by Jesse Wells
-
PSU Fall Protection 2023.pdfJul 26, 2023 • attached by Vanessa Bierly
-
GPC-Requirements.pdfJul 26, 2023 • attached by Vanessa Bierly
-
01 20 00 PRICE AND PAYMENT PROCEDURESJul 25, 2023 • contributed by Vanessa Bierly
-
28 00 00 ELECTRONIC SAFETY AND SECURITYJun 15, 2023 • contributed by Vanessa Bierly
-
Video Surveillance Specification.pdfJun 15, 2023 • attached by Vanessa Bierly
-
PSU OPP Contractor Safety Requirements.pdfJun 06, 2023 • attached by Vanessa Bierly
-
Property Inventory Classification.pdfMay 19, 2023 • attached by Bikem M. Oskin
-
Steel Certificate.pdfMay 19, 2023 • attached by Bikem M. Oskin
-
AE Single Sole Source Justification.pdfMay 19, 2023 • attached by Bikem M. Oskin
-
33 00 00 UTILITIESApr 25, 2023 • contributed by Vanessa Bierly
-
BR_Web_Form.xlsxApr 07, 2023 • attached by Jesse Wells