.01 Submittals Table

  1. To assist the Contractor(s) in following through on all the various submittals that will be required of them, the Professional shall include in the contract documents, complete with the Specification section/paragraph reference, a table indicating all the shop drawings, catalog data, manufacturer's operating instructions, maintenance instructions, certificates, warranties, guarantees and any other pertinent operating and maintenance data.
.02 Fire Rated Construction Assemblies
All construction assemblies which require a specific fire rating; i.e., 1-hour, 2-hour, etc., shall be so designated on the construction drawings.

 

In addition, the governing agency or applicable code, edition, and date shall also be indicated.  The purpose of this is so that the University can maintain the required ratings when future revisions are made.

Panel
borderColorlightgrey
bgColorwhite
borderWidth1
borderStylesolid
Div
idnoprint
classnoprint

Page Navigation

Table of Contents
minLevel2
indent3px
stylenone
printablefalse
classdivision-toc


Related Files

Attachments
uploadfalse
oldfalse
patterns.*pdf,.*doc,.*docx,.*xls,.*xlsx,txt,.*dwg,.*rtf
sortByname

Include Page
Wiki-CSS
Wiki-CSS