Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

.01 Submittals Table

  1. To assist the Contractor(s) in following through on all the various submittals that will be required of them, the Professional shall include in the contract documents, complete with the Specification section/paragraph reference, a table indicating all the shop drawings, catalog data, manufacturer's operating instructions, maintenance instructions, certificates, warranties, guarantees and any other pertinent operating and maintenance data.

.02 Fire Rated Construction Assemblies
  1. All construction assemblies which require a specific fire rating; i.e., 1-hour, 2-hour, etc., shall be so designated on the construction drawings.  In addition, the governing agency or applicable code, edition, and date shall also be indicated.  The purpose of this is so that the University can maintain the required ratings when future revisions are made.

Page Navigation


Related Files

  File Modified

  • No labels