Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

TitleEffective DateDescription
Section 26 00 00 ElectricalJun 06, 2017 10:55 AMAn update to the University’s lighting standards throughout division 26; to accomplish needed change and revision. Section 26 09 23 Lighting Control Devices  and Systems, 26 51 00 Interior Lighting, 26 52 00 Emergency Lighting
Section 01 35 20 Safety RequirementsMay 22, 2017 11:45 AMTo add sub section .03 Prevention through Design Standards
Section 23 21 13 Hydronic Piping GuidespecMar 22, 2017 07:05 AMComplete replacement of existing word document specification in table
Section 33 40 00 Stormwater DrainageMar 16, 2017 02:10 PMStormwater section major delete and replace
Section 23 25 00 HVAC Water Treatment-commonwealth -PDFMar 13, 2017 02:40 PMWater treatment Commonwealth
Section 23 21 13 D02 pdfMar 13, 2017 02:35 PMHydronic Plant Piping Schematic D2
Section 23 21 13D01pdfMar 13, 2017 02:30 PMHydronic Plant Piping Schematic
Section 23 25 00 HVAC Water Treatment-commonwealth -word docMar 13, 2017 08:55 AMHVAC Water Treatment for Commonwealth
Section 23 25 00 HVAC Water TreatmentMar 09, 2017 08:20 AMSection was updated to meet Project-specific requirements.
Section 26 00 00 LightingNov 03, 2016 11:03 AMUpdate lighting standards throughout division 26
Section 25 55 00Oct 26, 2016 03:03 PMReplaced section 25 55 00 dated Sept. 2016 with revised section 25 55 00 dated Oct. 2016
Section 23 82 00 Convection Heating and Cooling UnitsOct 05, 2016 11:10 AMModified subsections .01 and .02 regarding coil selection criteria, including the intent to support the future use of 140 degree water.
Section 25 55 00Sep 22, 2016 02:00 PMReplaced section 25 55 00 dated NOV2015 in its entirety with new section 25 55 00 dated SEPT2016
Section 01 35 20 Safety RequirementsSep 09, 2016 11:50 AMTo revise safety requirements
Section 26 50 00 LightingJul 19, 2016 09:22 AMA University lighting matrix was added to the standard for clarity.
Section 26 36 00 Transfer SwitchesJun 17, 2016 08:40 AMDeleted old section and replaced with new section, which includes a new guide specification section and new additional data sheet.
Section 26 22 00 Low-voltage TransformersJun 16, 2016 11:10 AMDeleted old section and replaced with new section, which includes a new guide specification section and new additional datasheet.
Section 26 24 16 PanelboardsJun 16, 2016 11:10 AMDeleted old section and replaced with new section, which includes a new guide specification section and new additional datasheet.
Section 26 32 13 Engine GeneratorsJun 16, 2016 11:05 AMDeleted old section and replaced with new section, which includes a new guide specification section and new additional datasheet.
Section 26 24 13 SwitchboardsJun 14, 2016 02:30 PM

Delete old section and replace with new section

Section 26 05 53 Identificaiton for Electrical SystemsJun 08, 2016 10:35 AMDelete and replace section
Section 26 05 73 Power Systems StudiesJun 08, 2016 09:15 AMDeleted old section and replaced with new section, which includes a new guide specification section and sample standard arc flash labels.
Section 26 05 26 GroundingJun 02, 2016 02:00 PMSection deletion and replacement
Section 26 00 01 Owner General RequirementsJun 02, 2016 09:30 AMrev to part E
28 00 00 Electronic Safety and SecurityMay 19, 2016 01:55 PMUpdate Fire Alarm Standards
22 31 00 Domestic Water SoftenersMay 19, 2016 11:05 AMRevisions to the domestic water softener section to remove ion exchange softeners.
01 05 05 Space PlanningMay 17, 2016 02:10 PM.07 Addition of Lactating Rooms to PSU Design & Construction Standards
01 05 05 Space PlanningMay 17, 2016 01:55 PMTo revise Section .05 Unisex Toilet Rooms
01 40 00 Quality RequirementsApr 25, 2016 10:46 AMRevised Environmental Compliance Checklist 4-4-16
09 68 10 Carpet TileApr 25, 2016 10:15 AMRevisions to 096810 Carpet Tile as a result of the most recent University Sustainable Carpet Committee assessment process.
32 00 00 Exterior ImprovementsApr 13, 2016 02:55 PM32 90 00.02 Planting Revisions
01 40 00 Quality RequirementsJan 12, 2016 09:25 AMRevised Environmental Compliance Checklist
23 00 10 Subsection 12Dec 16, 2015 09:34 AMLaboratory Ventilation Systems - Replace entire subsection
25 00 00Dec 02, 2015 10:15 AM25 55 00 BAS Guide Spec Update -November 2015 version
23 00 10 Subsection 12Nov 16, 2015 11:25 AMLab Vent Systems - EHS Interim Guidance
25 00 00Nov 02, 2015 02:10 PM25 55 00 BAS Guide Spec Update - October 2015 version
08 70 00Oct 27, 2015 01:45 PMUpdated door hardware
Section 07 00 00Oct 07, 2015 04:10 PMSection was updated to reflect changes in roof construction.
Section 23 21 13Oct 07, 2015 10:10 AMSection was updated to reflect prohibition on air pressure testing in hydronic piping systems.
Section 08 00 00Jul 14, 2015 10:00 AMSection was updated primarily for the following reasons: 1) To rename main heading of Division to match current industry practice 2) To consolidate requirem...
Section 01 81 13Jul 13, 2015 09:35 AMAdded alternate bid requirements for Energy Conservation options.
Section 32 90 00Jul 10, 2015 10:20 AMModified subsections .02 and .03
Section 14 20 00Jul 01, 2015 02:50 PMUpdated entire section on Elevators
Section 25 00 00Apr 30, 2015 03:09 PMUpdated document table in section 25 00 00. Remainder of section is unchanged.
Section 01 81 13Apr 03, 2015 12:10 PMDeleted .01 Owner General Requirements and Design Intent and .02 LEED Certification Requirements and replaced with new text.
Section 23 00 01Mar 20, 2015 01:45 PMAdded link to 01 00 00 General Requirements
Section 01 50 00Mar 17, 2015 02:22 PMAdded new subsection 01 56 16 to section 01 50 00
Section 26 36 00Mar 16, 2015 09:10 AMModified section 26 36 00
Division 26 00 00Feb 20, 2015 03:07 PMRevised various sections in Division 26
Section 26 36 00Feb 06, 2015 10:55 AMModified Section 26 36 00 Transfer Switches
Section 23 21 23Jan 16, 2015 10:58 AMModified subsection .03 in Section 23 21 23
Section 23 25 00Oct 24, 2014 02:36 PMModified Section 23 25 00 HVAC Water Treatment to include a new guide specification.
Section 33 10 00Sep 19, 2014 02:17 PMReplaced Section 33 10 00 in its entirety
Section 26 29 23Aug 27, 2014 01:00 PMReplaced OPP VFD GuideSpec document
Section 25 90 00Jul 29, 2014 12:42 PMRemoved guide sequences of operation and replaced with guide sequences of operation
Section 25 90 00Jul 29, 2014 12:25 PMRemoved guide sequences table and replaced it with guide sequences of operation
Section 25 00 00Jul 15, 2014 09:48 AMReplaced updated Building Automation Systems (BAS) document
Section 25 90 00Mar 18, 2014 03:53 PMReplaced the document for "Air terminal Units - Single Duct Variable Air Volume with Hot Water Reheat & Permiter Heating"
Section 01 41 00Mar 06, 2014 11:36 AMUpdated Environmental regulatory Compliance Checklist and Addendum documents
Section 23 21 16Mar 03, 2014 01:53 PMDeleted subsection .05 Hydronic Specialties. Added section 23 21 16 in its entirety.
Section 26 50 00Feb 20, 2014 11:56 AMModified subsection .01 - Lighting Design
Section 25 90 00Feb 12, 2014 02:04 PMUpdated the EUMS document
Section 22 11 00Dec 06, 2013 03:31 PMDeleted some text in subsection .01 of Section 22 11 00
Section 01 41 00Nov 14, 2013 10:03 AMModified section 01 41 00 to include Environmental Compliance Checklist
Section 09 68 10Sep 18, 2013 11:26 AMModified section 09 68 10
Section 26 05 26Sep 16, 2013 02:24 PMReworded subsection .01 General in Section 26 05 26 to include 2-hold lug requirement.
Section 23 05 01Jul 03, 2013 09:16 AMModify subsection .02.A.4 in Section 23 05 01. Remainder of section is unchanged.
Section 23 31 00Jun 25, 2013 02:49 PMModified subsection .01 in Section 23 31 00. Remainder of section is unchanged.
Section 23 00 01Jun 20, 2013 11:50 AMModified subsection .01, paragraph 5 in section 23 00 01. Remainder of section is unchanged.
Section 23 00 10Jun 19, 2013 02:19 PMAdded new subsection .12 in its entirety in Section 23 00 10
Section 23 07 00Jun 19, 2013 01:50 PMDeleted the current section and replaced it in its entirety
Section 08 00 00May 17, 2013 08:49 AMadded specific requirements for thermally broken frames and edge spacers
Section 23 41 00May 16, 2013 05:58 PMAdded new text to 23 41 00
Section 25 90 00May 16, 2013 04:51 PMUpdated the table with a new document
Section 01 78 46Mar 08, 2013 09:48 AMAdded new subsection "01 78 46 Attic Stock" under section 01 70 00
Section 23 34 00Feb 27, 2013 12:14 PMReplaced Section 23 34 00 in it's entirety.
Section 26 22 00Dec 10, 2012 11:15 AMUpdated Section 26 22 00
Section 26 56 00Nov 28, 2012 08:29 AMAdded new test related to pole manufacturers and sensor control of luminaires
Section 26 09 00Nov 27, 2012 02:19 PMUpdated requirements for occupancy sensor controls.
Section 26 53 00Nov 26, 2012 12:14 PMAdded clarification regarding acceptance of red LED exit signs.
Section 26 00 01Oct 29, 2012 10:01 AMModified .10 Scope to add new paragraph "h" under Support Circuitry.
Section 26 05 43Oct 29, 2012 08:50 AMAdded paragraph to .01 Underground Ducts and Raceways for Electrical Systems
Section 26 52 00Oct 29, 2012 08:35 AMAdded additional paragraph in .01 General (26 52 00 Emergency Lighting)
Section 26 50 00Oct 26, 2012 12:37 PMAdded subheading .01 in 26 50 00. Reworded .01 and .02, and added subheading .08 in 26 51 11. Remainder of section is unchanged.
Section 33 62 00Oct 11, 2012 09:48 AMReplaced documents with updated details and sequences
Section 23 21 13Sep 20, 2012 03:30 PMDeleted subsection .01 and .02 and replaced with new .01 to .04 in their entirety. Relocate text from existing subsection .03 to new .05 and delete remaining e...
Section 23 05 01Aug 31, 2012 03:38 PMAdded a link to 23 21 00 Hydronic Piping and Pumps in subsection .02 B
Section 23 22 00Aug 17, 2012 12:57 PMAdded Subsection .04 to Section 23 22 00
Section 23 21 00Aug 16, 2012 04:10 PMRemoved existing subsection .01 and replaced with new text. Added new text in subsections .03, .04, .05, and .06. Subsection .02 unchanged.
Section 09 60 00Aug 02, 2012 04:06 PMAdded Section 09 60 00 to Division 09.
Section 25 00 00Jul 24, 2012 03:48 PMReplaced link to revised document "Building Automation Systems (BAS)"
Section 23 00 10Jul 19, 2012 02:31 PMReplaced subsection .03 with new text, taking out the old table.
Section 23 31 00Jul 10, 2012 03:22 PMModified heading of Part .01 and replaced text under subpart A
Section 26 29 23Jul 09, 2012 04:30 PMInsert Document Table with new text and update the associated word document "OPP VFD Guidespec"
Division 26Jun 22, 2012 05:23 PMModified various sections in Division 26
Section 23 21 00May 17, 2012 08:54 AMSubsection .02 B - revised requirements on combination shut-off balance valves.
Section 31 30 00May 16, 2012 03:34 PMAdded specification to address expansive aggregate
Section 03 00 01May 16, 2012 10:24 AMSection was added to reference new "Sructural Backfill and Compaction" Specification.
Section 32 01 00May 15, 2012 02:08 PMSection was revised to reflect changes to hiring of testing agencies
Section 23 72 00Apr 18, 2012 09:51 AMSection 23 73 00, part .02, items B and F were modified. Remainder of section is unchanged.
Section 23 21 23Apr 09, 2012 01:51 PMModify subsection .03.A.6 of Section 23 21 23. Remainder of section is unchanged.
Section 25 00 00Apr 06, 2012 08:17 AMReplaced Building Automation Systems document.
Section 25 90 00Feb 28, 2012 03:31 PMModify current section to replace linked document with updated document.
Section 01 05 05.01Feb 28, 2012 02:27 PMModify current section to include requirements for card readers.
Section 23 21 13Jan 30, 2012 11:05 AMAdditions to section 23 21 13
Section 12 40 00Jan 26, 2012 12:37 PMAddition of section 12 40 00
Section 28 00 00Jan 16, 2012 11:32 AMPost Revised specifications from ACES
Section 33 50 00Jan 12, 2012 10:02 AMUpdate 335000.01 to include 49 CFR Part 192 regulatory requirements for all PSU properties
Section 23 57 00Jan 09, 2012 10:45 AMReplace current section in its entirety to follow common industry practice and to expand section into three parts.
Section 23 05 01.02Jan 06, 2012 08:40 AM 
Section 23 05 01_02 and 23 21 13Nov 03, 2011 09:15 AMModify Secion 23 05 01_02 and Section 23 21 13_03 to delete conflicts and add cross references to other updated sections related to balancing valves in general ...
Section 28 00 00Nov 02, 2011 11:32 AMRemove old uploaded document and replace with new version. Add 3 additional uploaded document.
Section 23 05 01Nov 01, 2011 02:44 PMReplace obsolete Mechanical Color Code painting 1. Follow current industry ANSI/ASME A13.1 Standard for color coding scheme and piping system i...
Section 23 70 00Nov 01, 2011 01:05 PMEnergy Recovery and Air Handling Units.
Section 23 21 00.02Sep 26, 2011 09:04 AMAddition of section 23 21 00.02, Flow Balance and Differential Pressure Control
Section 23 21 23Sep 21, 2011 11:05 AMModify subsection .03, a.5 in Section 23 21 23. Remainder of section is unchanged.
Revision 01 01 02Sep 21, 2011 10:27 AMUpdate requirements document to match current University expectations for Design Review Deliverables.
Section 09 90 00Sep 16, 2011 07:52 AMUpdate paint manufacturers.
Section 25 90 00Aug 15, 2011 01:40 PMUpdate to 25 90 00 EUMS Document rev3
Section 23 21 13Aug 15, 2011 11:32 AMRevision to 23 21 13.03 A, Hydronic Specialties
Section 23 22 00Jul 22, 2011 08:10 AMRevisions to Section 23 22 00 completed 7/22/2011
Section 01 01 00 and 23 05 01Jul 22, 2011 08:09 AMModify Sections 01 01 00 subsection .01 and 23 05 01 subsection .05 per the following (deletions are shown struck through and additions are double underlined). ...
Section 25 00 00Apr 26, 2011 09:42 AMCriteria for Belimo PICCV valve selection developed by Steve Oskin
Section 33 62 00Apr 25, 2011 11:20 AMUploading new documents to the section, and fixing one misspelling.
Section 07 00 00Apr 25, 2011 09:20 AMAdditions to current section to include cross references.
Section 22 11 00Apr 22, 2011 01:45 PMAdd more detailed general, materials, and installations requirements for pressed joint system.
Section 23 82 00 / 23 82 19Mar 08, 2011 01:38 PMAdd new section to replace outdated references in 23 82 00 .04
Section 25 00 00Mar 07, 2011 12:59 PMUpdate Building Audtomation Systems (BAS) Guide Spec
Section 23 64 00Dec 20, 2010 11:29 AM 
Section 33 60 00, 33 61 00 and 33 62 00Dec 20, 2010 10:38 AMUpdate sections with added content and document clarification.
Section 25 90 00Dec 03, 2010 12:00 AMRevise AHU Sequence of Operation and add supporting diagrams.
Section 26 29 23Dec 01, 2010 02:10 PMRevise guidance and description of VFD specification, update guide specification with new document.
Section 23 00 01Nov 09, 2010 11:49 AMCoordinate with section 01 81 13, expand general HVAC design and coordination requirements, and general reorganization.
Section 01 81 13Oct 28, 2010 02:55 PMUpdate to further describe sustainable design objectives, and to adopt ASHRAE Standard 189.1 as high performance "Green" Standard for the University.
Section 25 90 00Oct 11, 2010 10:42 AMUpload new guide Sequence of Operations for Enterprise Utility Management System (EUMS) Equipment Control Strategies
Section 22 40 00Oct 11, 2010 10:30 AMupdate requirements for water closets, urinals, and floor drains.
Section 01 56 10Aug 16, 2010 11:00 AMAdd outdoor air intake protection requirements
Section 25 90 00Jun 22, 2010 02:54 PMReplace June 2009 version of the following embedded document: Remainder of section is unchanged.
Section 01 25 30Apr 19, 2010 11:12 AMRevise Division 01 to provide a dedicated section (01 25 30) for safety requirements; add new fall protection requirements.
Section 25 90 00Apr 19, 2010 10:55 AMUpload new guide Sequence of Operation for Air Terminal Units - Single Duct Variable Air Volume with Hot Water Reheat & Perimeter Heating
Sections 26 05 53 through 26 56 00Mar 18, 2010 10:00 AMUpdate of several sections within Division 26, including labeling, lift equipment requirements, lighting controls, generators, transfer switches, surge suppress...
Sections 23 05 01 and 23 05 19Dec 04, 2009 08:57 AMRevise thermometer and gauge requirements in HVAC systems.
Revision 01 35 13Nov 10, 2009 11:11 AMUpload HMC Infection Control Policy at .02C
Section 23 21 23Nov 02, 2009 11:21 AMUpdate requirements of flexible pump couplings for Base Mounted End Suction Pumps and Base Mounted Double Suction Pumps.
Section 01 05 05Oct 30, 2009 03:31 PMUpdate dumpster location requirements and compactor requirements.
Sections 08 00 01, 08 10 00, 08 50 00, 08 80 00Sep 21, 2009 02:38 PMUpdate to window and glazing standards.
Section 01 35 13Aug 28, 2009 10:49 AMUpload new HMC Design Standards documents
Section 01 35 13Aug 28, 2009 10:47 AMAdd new section 01 35 13
Section 28 00 00Aug 28, 2009 09:46 AMUpload new specifications document to standards.
Section 13 21 00Aug 18, 2009 10:15 AMModify minimum face velocity and component requirements of hoods in radioisotope laboratories.
Section 23 70 00Aug 13, 2009 01:14 PMUpdate air handler requirements regarding efficiency, system reliability, redundancy, identification, fan arrangement considerations, proper mixing, bearings, d...
Section 25 90 00Jul 07, 2009 12:27 PMUpdated temperature control sequence description and explanatory text
Section 25 90 00Jul 07, 2009 12:24 PMAdd a new document describing the sequences of operation necessary to accomplish the HVAC functions of the Enterprise Utility Management System (EUMS).
Section 23 21 23Jun 29, 2009 12:00 AMReplace current section in its entirety to include new requirements of general design and installation.
Section 01 81 13NoneAdded new subsection .04 in its entirety. Remainder of section unchanged.

 

 

 

 

 

 

 

 

  • No labels