Comply with Space Planning for Engineered Building System requirements in Introduction.
Coordinate and comply with other applicable mechanical room requirements as described in 23 00 01.06.
.03 Janitor Rooms
Coordinate and comply with all applicable Janitor room requirements as described in 23 00 01.06.
.04 Laboratory Equipment
Where laboratory equipment is shown on the general construction drawings, this equipment shall also be shown on the plumbing drawings. The equipment shall bear the same identification numbers on all sets of drawings.
The same equipment schedule shall appear on the architectural, and plumbing drawings. This schedule shall give the equipment identification number, equipment description, services required, and the Contractor who is to furnish and install this equipment.