Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

22 00 01 Owner General Requirements and Design Intent

.01 Utilities (Refer to Division 33)

.02 Mechanical Rooms
  1. Comply with Space Planning for Engineered Building System requirements in Introduction.
  2. Coordinate and comply with other applicable mechanical room requirements as described in 23 00 01.06.

.03 Janitor Rooms
  1. Coordinate and comply with all applicable Janitor room requirements as described in 23 00 01.06.

.04 Laboratory Equipment
  1. Where laboratory equipment is shown on the general construction drawings, this equipment shall also be shown on the plumbing drawings.  The equipment shall bear the same identification numbers on all sets of drawings.
  2. The same equipment schedule shall appear on the architectural, and plumbing drawings.  This schedule shall give the equipment identification number, equipment description, services required, and the Contractor who is to furnish and install this equipment.

Page Navigation


Related Files

  File Modified

  • No labels