Spaces
Apps
Templates
Create
OPP Design and Construction Standards
All content
Space settings
Content
Results will update as you type.
•
Division 00 - Procurement and Contracting Requirements
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 07 - Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating, Ventilating, and Air-Conditioning HVAC
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
•
33 00 00 UTILITIES
•
33 10 00 WATER UTILITIES
•
33 20 00 WELLS
•
33 30 00 SANITARY SEWERAGE UTILITIES
•
33 35 00 Reclaimed Water Utilities
•
33 40 00 STORM DRAINAGE UTILITIES
•
33 50 00 FUEL DISTRIBUTION UTILITIES
•
33 56 00 FUEL-STORAGE TANKS
•
33 60 00 HYDRONIC AND STEAM ENERGY UTILITIES
•
33 61 00 HYDRONIC ENERGY DISTRIBUTION (RESERVED)
•
33 62 00 CAMPUS CHILLED WATER DISTRIBUTION
•
33 63 00 STEAM ENERGY DISTRIBUTION
•
33 70 00 ELECTRICAL UTILITIES
•
33 80 00 COMMUNICATIONS UTILITIES
Revision Log and Archive
•
Construction Services QA/QC Checklists
Blogs
OPP Design and Construction Standards
/
Division 33 - Utilities
/
33 80 00 COMMUNICATIONS UTILITIES
Summarize
33 80 00 COMMUNICATIONS UTILITIES
Former user (Deleted)
Owned by
Former user (Deleted)
Last updated:
Aug 01, 2017
1 min read
Loading data...
.01 CCS
Refer to
Â
Division 23 09 00
Â
and
Â
25 00 00
.
.02 Telecommunications
See
Â
Division 27
.
Page Navigation
Related Files
Â
File
Modified
{"serverDuration": 13, "requestCorrelationId": "73d5ac7542774afc84632cf87dd461db"}