33 62 00 CAMPUS CHILLED WATER DISTRIBUTION
- Former user (Deleted)
- Former user (Deleted)
33 62 00 CAMPUS CHILLED WATER DISTRIBUTION
- General
- Much of University Park Campus is, or will be, served by a campus look chilled water system. The chilled water system of each new building must be designed so as to be compatible with the characteristics of the campus chilled water system.
- Coordinating building connection requirements and proposed loads with Engineering Services, Office of Physical Plant.
- Details: Refer to miscellaneous typical guideline details below. Adapt to project specific requirements.
Document | Version Date | Description |
---|---|---|
SK1 (AutoCAD file)Â (PDF Document)Â Â Â Â | Â February 2012 | Campus chilled water system service entrance detail for buildings that do NOT require a heat exchanger. |
Sequence of Operation | Â August 2012 | Sequence of Operation for campus chilled water system service entrance detail for buildings that do NOT require a heat exchanger. |
SK-2 (AutoCAD file)Â (PDF Document)Â Â Â Â Â | Â March 2012 | Campus chilled water system service entrance detail for buildings that require a heat exchanger. |
Sequence of Operation | Â August 2012 | Sequence of Operation for campus chilled water system service entrance detail for buildings that require a heat exchanger. |
Isolation Valve (AutoCAD file) Â Â (PDF Document) | Â | Details of a campus chilled water isolation valve installation. |
Air Vent (AutoCAD file) Â Â (PDF Document)Â Â Â Â | Â | Detail of a campus chilled water air vent. |
Sediment Blowoff (AutoCAD file)Â Â Â Â (PDF Document) | Â | Detail of a campus chilled water sediment blowoff. |
 Building Wall Penetration (AutoCAD file)    (PDF Document) |  | Detail of a campus chilled water building penetration. |
Â
Page Navigation
Related Files
 | File | Modified |
---|---|---|
Aug 01, 2017 by Former user | ||
Aug 01, 2017 by Former user | ||
PDF File Air_Vent.pdf |
Aug 01, 2017 by Former user | |
PDF File Building_Wall_Penetration.pdf |
Aug 01, 2017 by Former user | |
Aug 01, 2017 by Former user | ||
PDF File Isolation_Valve.pdf |
Aug 01, 2017 by Former user | |
Microsoft Word Document Master chilled wate entrance no HX.docx |
Aug 22, 2017 by Former user | |
Microsoft Word Document Master chilled water entrance with HX.docx |
Aug 22, 2017 by Former user | |
PDF File Sediment_Blowoff.pdf |
Aug 01, 2017 by Former user | |
PDF File SK1.pdf |
Aug 01, 2017 by Former user | |
PDF File SK2.pdf |
Aug 01, 2017 by Former user | |
Aug 01, 2017 by Former user | ||
Aug 01, 2017 by Former user | ||
Aug 01, 2017 by Former user |