31 10 00 SITE CLEARING
- Former user (Deleted)
- Former user (Deleted)
Owned by Former user (Deleted)
.01 Site Clearance
- Protection:Â The Contractor shall provide and maintain adequate guards, fences, lights, warning signs and similar items as may be required.
- Grubbing:Â The Contractor shall remove and dispose of all shrubs, stumps and roots larger than 1 1/2" in diameter, to a depth of 20 inches.
- Plantings to be removed by the University will be removed prior to commencement of any work at the site.
- Plantings to be removed by the Contractor shall be classified as debris and shall be removed by the Contractor off University property.
- Disposal of Material:Â All refuse and other debris shall be disposed of by hauling from the site and off University property.
- Material to be removed shall be removed daily and shall not be allowed to accumulate on the site.
Page Navigation
Related Files
 | File | Modified |
---|