31 10 00 SITE CLEARING

.01 Site Clearance
  1. Protection:  The Contractor shall provide and maintain adequate guards, fences, lights, warning signs and similar items as may be required.
  2. Grubbing:  The Contractor shall remove and dispose of all shrubs, stumps and roots larger than 1 1/2" in diameter, to a depth of 20 inches.
  3. Plantings to be removed by the University will be removed prior to commencement of any work at the site.
  4. Plantings to be removed by the Contractor shall be classified as debris and shall be removed by the Contractor off University property.
  5. Disposal of Material:  All refuse and other debris shall be disposed of by hauling from the site and off University property.
  6. Material to be removed shall be removed daily and shall not be allowed to accumulate on the site.

Page Navigation


Related Files

  File Modified