Revision Log and Archive
- Former user (Deleted)
The Office of Physical Plant updates the Design and Construction Standards as needed to keep pace with changing technology and changes in University requirements.
Comments and proposed corrections or revisions are welcome from all users of the Standards and should be directed in writing via email to opp_es@ums.psu.edu.
All proposed changes to the Standards are reviewed by the Standards Coordinator and a Standards Team composed of technical experts representing a cross section of OPP.
Upon review and approval by the Standards Coordinator and Standards Team, a proposed revision will be implemented.
Significant changes to the Standards that have been implemented are recorded in the Revision Log. Note that the University does not record corrections of typographical errors, non-technical grammatical corrections, changes to Division 00, or changes to the Introduction to the Design Standards in the Revision Log.
The most recent revisions are highlighted on the right side of this page. To see a complete list of all revisions since the last archive, follow the link below to the Revision Log. At the Revision Log page, users can view the full text of each revision and can subscribe to an RSS feed to be notified of new changes in their news feed viewer.
Click Here to subscribe to Revision Log updates via RSS
PSU Design Standards Revisions Log
Older versions of the Design and Construction Standards are stored in the Archives folder. To view these archived versions, follow the link below.
Recent updates
-
Design and Construction StandardsOct 30, 2024 • contributed by Bikem M. Oskin
-
01 80 00 PERFORMANCE REQUIREMENTSOct 25, 2024 • contributed by Vanessa Bierly
-
Penn State (PSU) LEED v4 Policy 2019 Update v 1.0 (1).pdfOct 25, 2024 • attached by Vanessa Bierly
-
32 90 00 PLANTINGOct 23, 2024 • contributed by Vanessa Bierly
-
329000.03 Trees and Shrubs(2).docxOct 23, 2024 • attached by Vanessa Bierly
-
329000.02 Lawns and Grasses (1).docxOct 23, 2024 • attached by Vanessa Bierly
-
31 01 00 GENERAL REQUIREMENTS AND OWNER INTENTOct 23, 2024 • contributed by Vanessa Bierly
-
310100.04 Soil Protection Zone.docxOct 23, 2024 • attached by Vanessa Bierly
-
01 05 00 GENERAL PROJECT REQUIREMENTSOct 09, 2024 • contributed by Vanessa Bierly
-
Penn State Space Guidelines.pdfOct 09, 2024 • attached by Vanessa Bierly
-
08 70 00 HARDWAREOct 02, 2024 • contributed by Vanessa Bierly
-
2024_0909 GPC-Requirements.pdfSept 11, 2024 • attached by Vanessa Bierly
-
28 31 00 FIRE DETECTION AND ALARMAug 21, 2024 • contributed by Vanessa Bierly
-
28 31 00 Fire Detection and Alarm Standards-University Park.docxAug 21, 2024 • attached by Vanessa Bierly
-
28 31 00 Fire Detection and Alarm Standards-Commonwealth Campuses.docxAug 21, 2024 • attached by Vanessa Bierly
-
Division 00 - Procurement and Contracting RequirementsAug 01, 2024 • contributed by Jesse Wells
-
Change Order Summary and Cost Breakdown Form.xlsmAug 01, 2024 • attached by Jesse Wells
-
23 00 00 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)Jul 22, 2024 • contributed by Pete Clarke
-
23 21 00 HYDRONIC SYSTEMSJul 22, 2024 • contributed by Vanessa Bierly
-
FOA 1-S_20240705-WEB.pdfJul 05, 2024 • attached by Bikem M. Oskin
-
FOA 1-P_20240705-WEB.pdfJul 05, 2024 • attached by Bikem M. Oskin
-
26 41 00 FACILITY LIGHTNING PROTECTIONJun 21, 2024 • contributed by Vanessa Bierly
-
01 01 00 PROJECT DOCUMENT FORMATJun 21, 2024 • contributed by Vanessa Bierly
-
OPP Design Phase Deliverables.pdfJun 21, 2024 • attached by Vanessa Bierly
-
01 30 00 ADMINISTRATIVE REQUIREMENTSJun 21, 2024 • contributed by Vanessa Bierly
-
PSU Fall Protection 2023.pdfJun 21, 2024 • attached by Vanessa Bierly
-
25 90 00 GUIDE SEQUENCES OF OPERATIONJun 13, 2024 • contributed by Vanessa Bierly
-
25 00 00 INTEGRATED AUTOMATIONJun 13, 2024 • contributed by Vanessa Bierly
-
28 00 00 ELECTRONIC SAFETY AND SECURITYJun 13, 2024 • contributed by Vanessa Bierly
-
Access Control Specification.pdfJun 13, 2024 • attached by Vanessa Bierly
-
1-CM-A Agreement MASTER.pdfJun 11, 2024 • attached by Jesse Wells
-
22 40 00 PLUMBING FIXTURESJun 06, 2024 • contributed by Vanessa Bierly
-
Video Surveillance Specification.pdfMay 10, 2024 • attached by Vanessa Bierly
-
JOC Proposal Review Instructions.pdfApr 19, 2024 • attached by Jesse Wells
-
09 60 00 FLOORINGMar 28, 2024 • contributed by Vanessa Bierly
-
26 05 00 COMMON WORK RESULTS FOR ELECTRICALMar 04, 2024 • contributed by Vanessa Bierly
-
Minimum Clearances for Pad-Mounted Equipment.pdfMar 04, 2024 • attached by Vanessa Bierly
-
26 51 00 INTERIOR LIGHTINGFeb 01, 2024 • contributed by Vanessa Bierly
-
26 50 00 LIGHTINGFeb 01, 2024 • contributed by Vanessa Bierly
-
Site Lighting Naming Convention.pdfJan 29, 2024 • attached by Vanessa Bierly
-
26 56 00 EXTERIOR LIGHTINGJan 29, 2024 • contributed by Vanessa Bierly
-
26 52 00 EMERGENCY LIGHTINGJan 29, 2024 • contributed by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
26 09 23 Lighting Control Devices and SystemsJan 29, 2024 • contributed by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
Lighting Design Matrix Rev 2.3 (2024).pdfJan 29, 2024 • attached by Vanessa Bierly
-
JOC Joint Meeting Topics New.docxOct 25, 2023 • attached by Jesse Wells
-
1-CM-GMP.pdfOct 12, 2023 • attached by Jesse Wells